For those like me who can't read the right side of the formula, it's: ... = crafting time(minutes)

The more points assigned in a skill, the faster your workers will produce items that require that skill. More exactly, the time taken to craft an item is the sum of the contributions from each skill required to craft the item. For example: Your two workers are the Blacksmith Blacksmith and the Carpenter Carpenter. You distributed their skill points as shown in the table below:

Skill Name Workers Total
Blacksmith Carpenter
Weapon Crafting Weaponcrafting 5 3 8
Metal Working Metalworking 6 NA 6
Wood Working Woodworking NA 10 10

A Parrying Dagger Parrying Dagger requires 16 Weaponcrafting and 18 Metalworking. The table below shows that it takes 5 minutes to craft:

Parrying Dagger

Blacksmith+Carpenter

Crafting time

in minutes

Weaponcrafting 16 8 16 / 8 = 2
Metalworking 18 6 18 / 6 = 3
Total crafting time: 2 + 3 = 5

If your Blacksmith and Carpenter combined had a total of 40 Weaponcrafting and 24 Metalworking, the Parrying Dagger would instead take (16 / 40) + (18 / 24) = 2/5 + 3/4 minutes = 69 seconds.